30% Off All Manual Window Shades – Automatically Applied at Checkout! Offer Ends October 21st.
Search

Case Study

AMARA WYNWOOD
Design-Focused Window Shade Solutions for a Creative Urban Hub

A Project Rooted in Design and Flexibility

Located in Miami’s vibrant Wynwood Arts District, Amara Wynwood is a design-forward, mid-rise multifamily development by Fifield Companies, built in collaboration with KAST Construction. The 532-unit property blends modern industrial architecture with creative amenities and expansive glazing—demanding a window treatment solution that delivered both performance and design continuity.

ShadeMonster was selected to provide and install custom solar and blackout shades across the entire project, ensuring comfort, light control, and a clean, consistent aesthetic throughout.

Project Goals

The design and construction teams needed a partner who could:

  • Provide matched blackout and solar shade systems across all units

  • Adapt to last-minute design changes without delaying the schedule

  • Deliver consistent, clean aesthetics using modern hardware

  • Offer fast, flexible production with hands-on project support

  • Coordinate seamlessly with GC and design teams

ShadeMonster’s Scope of Work

Products Supplied and Installed:

  • Bedrooms: Premium ShadeMonster Blackout Shades – Special White Beige

  • Living Areas: Premium ShadeMonster Solar Shades 5% openness – White + Linen   

  • Operation: Manually operated

  • Finish: Open roll design with 4″ aluminum fascia in a clean, architectural profile

Each unit received custom-measured shades to ensure precise fit and visual alignment, while offering the performance benefits required by the development team.

Challenges We Overcame

Last-Minute Fabric Revisions

Late in the design phase, the ownership group opted for a new fabric selection that required matching the blackout and solar shades in appearance and texture. Thanks to our in-house production and direct distributor relationships, we sourced the revised materials quickly and manufactured all shades with perfectly coordinated finishes—without compromising the delivery timeline.

Late-Stage Site Changes (TCO Phase)

Just before final installation, additional sprinkler lines were added to the balconies, which conflicted with the existing shade design. Working alongside the designers and KAST Construction, ShadeMonster adapted the mounting and install plan in real time, ensuring the sprinkler systems remained unobstructed—with no added costs or delays.

Results

✅ Over 500 units equipped with custom blackout and solar solutions
✅ Zero installation delays, despite fabric and fire safety changes
✅ Matched finishes across all units for design consistency
✅ Real-time collaboration with KAST and designers ensured smooth execution

A Partnership with KAST Construction

Our collaboration with KAST Construction was essential to the smooth execution of this project. Through constant communication and field coordination, we were able to:

  • Align product delivery with floor-by-floor construction rotations

  • Solve site-specific installation conflicts without slowing the build

  • Maintain accountability and transparency from measurement to final install

Why ShadeMonster

We don’t just supply window treatments—we help build smarter, better projects with:

    • Fast response and material flexibility thanks to in-house production

    • Problem-solving mindset on fast-moving development sites

    • Design alignment without sacrificing timeline or budget

    • Trusted by builders and designers to deliver under pressure

Need a shade partner who adapts as fast as your project moves?

Get in touch with ShadeMonster and let’s bring your vision to life—on time, on spec, and without compromise.

Get in Touch NowRequest Samples
[]